The city has selected a project to be funded out of the 2021-22 budget that will improve pedestrian and vehicular safety on Sharon Rd. The Sharon Rd Curve Project will help to flatten the curve at Eastburn so as to mitigate crashes as well as add a left turn lane at Eastburn and Sharon Rds that includes a pedestrian refuge. This project is estimated to cost around $3-$4M, approximately half of the funds allocated for South Charlotte.