The Barclay Downs sidewalk project has finally started. The $2.5 million dollar project will include new sidewalk, curb and gutter and street trees along the east side of Barclay Downs Dr. from Sayre to Runnymede. This project was funded through the city’s CNIP bond package and through a $250,000 contribution from the developer of The Encore apartment project.